Metal Fabrication

WELDING IN PROGRESS AT THE 28 INCHES TNP SECTIONAL REPLACEMENT PROJECT AT GIO… – OCTOBER 2018

View details
Metal Fabrication

Offshore & Onshore Pipeline Construction

SWAMP BUGGY STRINGING 24″ PIPES DURING SECTIONAL REPLACEMENT FOR THE 24″ TRUCK LINE @ KALIBIAMA FOR SHELL PET. DEV. COMPANY NIGERIA

View details
Offshore & Onshore Pipeline Construction

Corrosion Prevention & Control

WORK COMPLETED INSIDE THE CONSTRUCTED CONFERRDAM AT THE REPAIR ON 24_ NCTL (CAWC-BONNY LOOPLINE) AT KALIBIAMA AND ADAMAKIRI….

View details
Corrosion Prevention & Control

Valve Maintenance

FORM WORK IN PROGRESS DURING CONCRETE ENCASEMENT AND BACFILLING ON 28″NKPOKU – BOMU TNP AT GIO FOR SPDC NIGERIA…

View details
Valve Maintenance

Pipeline Project

WELDING OF 20″ PIPE IN PROGRESS FOR PRESSURE TESTING AT ACNL JETTY PRIOR TO SECTIONAL REPLACEMENT ON THE 20” KCTL FOR SHELL PET. DEV. COMPANY NIGERIA

View details
Pipeline Project

Marine Service

Excavation in progress inside cofferrdam at 28inch TNP @ Oloma PO No. 4510307390

View details
Marine Service

Construction Engineering

CONSTRUCTION OF COFFERDAM IN PROGRESS DURING 28INCH LEAK REPAIR BY CLAMPING AT OKOLO LUNCH P.O NO. 4510272728

View details
Construction Engineering

Heavy Equipments

ANASAMI CONSTRUCTION NIG. LTD. HEAVY EQUIPMENT

View details
Heavy Equipments

Valve Maintenance

Maintenance is essential to the performance of control valves and, consequently, the overall fluid handling or processing system.

View details
Valve Maintenance